Komstad Evangelical Covenant
Church
|
The Fellowship Hall Construction Project
( click any picture to see a larger version )
|
Here's a look at the new fellowship hall,
as it appears on September 3. The first picture shows the protected
main entrance, and you can see that there are no steps anymore. The second picture shows the fellowship
hall with most of the windows installed. |
|
|
The ground has been raised in front of the
entrance.
|
|
|
|
Much of the new building has been sided
already.
|
|
|
|
A
few weeks ago it was just a skeleton. |
|
|
Construction began in June, after a
dedication service at the end of May.
|
|
|
The first few shovels of dirt.
|
|
|
|
Shania won the special ceremonial shovel.
|
|
|
|
The church family at the dedication service.
|
|
|
|
|
|
|
The basement will go here.
|
|
|
|
|
|
|
Setting up forms to pour the basement walls
and foundation.
|
|
|
|
|
|
|
The building will be framed and heated, so
it can withstand the winter weather. Then the finish work will go on
for a while. There's a lot of work to do.
|
|
|
Getting ready to pour the basement floor.
|
|
|
|
The original foundation was concrete and
rock.
|
|
|
|
We cut a doorway through from the new
basement to the old.
|
|
|
|
|
|
|
Before the floor was poured.
|
|
|
|
|
The new entrance is at ground level, which
will be much easier to navigate.
|
|
|
|
|
The basement won't be finished right away.
|
|
|
|
|
|
|
The kitchen will be here.
|
|
|
|
The stained glass was covered to keep
the windows safe.
|
|
|
|
Looking like a real building.
|
|
|
|
|
The new face of the church.
|
|
|
|
The old windows will be protected from the
weather.
|
|
|
|
|
We proclaim to you what we have seen and
heard, so that you also may have fellowship with us.
And our fellowship is
with the Father and with his Son, Jesus Christ.
1 John 1:3
|
Beresford,
South Dakota
|
|